50 000 4 400 11 36.
Irc roof drains.
Therefore the irc also recognizes scuppers as being an acceptable method of roof drainage.
In practice it is safer to use 1 4 of fall per foot to ensure proper drainage and provide some wiggle room for error.
From a practical standpoint it makes sense as in my.
In such situations an ice barrier is required to prevent dammed meltwater from penetrating through the roof assembly and into the interior spaces.
Take the roof s total square footage and divide by the total square footage handled by one drain.
The result is the number of drains needed.
Overflow drains having the same size as the roof drains shall be installed with the inlet flow line located 2 inches 51 mm above the low point of the roof or overflow scuppers having three times the size of the roof drains and having a minimum opening height of 4 inches 102 mm shall be installed in the adjacent parapet walls with the inlet flow located 2 inches 51 mm above the low point of the roof served.
The imc dictates a 1 minimum pitch of the drain which is equal to 1 8 fall for every 12 foot of horizontal run.
Or 12 drains required.
Scuppers shall not have an opening dimension of less than 4 inches 102 mm.
Section 2003 irc r903 4 roof drainage states.
The international code council icc is a non profit organization dedicated to developing model codes and standards used in the design build and compliance process.
A ponding instability check is to be made assuming the primary roof drains are blocked.
In these instances new secondary drain.
When scuppers are used for secondary emergency overflow roof drainage the quantity size location and inlet elevation of the scuppers shall be sized to prevent the depth of ponding water from exceeding that for which the roof was designed as determined by section 1611 1.
The international codes i codes are the widely accepted comprehensive set of model codes used in the us and abroad to help ensure the engineering of safe sustainable affordable and resilient structures.
The international codes i codes are the widely accepted comprehensive set of model codes used in the us and abroad to help ensure the engineering of safe sustainable affordable and resilient structures.
Ings that do not have secondary roof drainage provisions such as overflow drains and overflow scuppers.
In irc 2015 and its previous editions roof assemblies are addressed in chapter 9 roof assemblies.
The international code council icc is a non profit organization dedicated to developing model codes and standards used in the design build and compliance process.
Within irc s chapter 9 section r908 reroofing addresses reroofing.
Where required for roof drainage scuppers shall be placed level with the roof surface in the wall or parapet.